采用高质量PVC材料制成,PVC套管安装于墙模板与对侧墙模板之间。施工时,平拉杆(Flat Tie)穿过PVC套管,有效防止平拉杆被混凝土包裹,便于后期拆卸与重复使用,提升施工效率,降低材料损耗。

采用高质量PVC材料制成,PVC套管安装于墙模板与对侧墙模板之间。施工时,平拉杆(Flat Tie)穿过PVC套管,有效防止平拉杆被混凝土包裹,便于后期拆卸与重复使用,提升施工效率,降低材料损耗。
采用高质量PVC材料制成,PVC套管安装于墙模板与对侧墙模板之间。施工时,平拉杆(Flat Tie)穿过PVC套管,有效防止平拉杆被混凝土包裹,便于后期拆卸与重复使用,提升施工效率,降低材料损耗。
材质耐用,抗压耐腐蚀
安装方便,提高施工效率
保护平拉杆,便于拆模回收
适用于各类铝模、木模和钢模系统
We believe the projects that we have executed speak for themselves. CITIC HIC has engineered and provided 6 AG mills of Ø12.2m×11m (28000kW gearless drive) and 6 overflow discharge ball mills of Ø7.9×13.6m (2×9000kW gear drive) for Sino Iron Project in Australia. For Zijin Mining’s Duobaoshan Copper Mine project in Heilongjiang, we have manufactured and provided SAG mills of Ø11×6.4m (2×9000kW) and overflow discharge ball mills of Ø7.9×13.6m (2×9000kW) which have been well operating currently.
We believe the projects that we have executed speak for themselves. CITIC HIC has engineered and provided 6 AG mills of Ø12.2m×11m (28000kW gearless drive) and 6 overflow discharge ball mills of Ø7.9×13.6m (2×9000kW gear drive) for Sino Iron Project in Australia. For Zijin Mining’s Duobaoshan Copper Mine project in Heilongjiang, we have manufactured and provided SAG mills of Ø11×6.4m (2×9000kW) and overflow discharge ball mills of Ø7.9×13.6m (2×9000kW) which have been well operating currently.