主控箱:控制整组爬架点同步升降,确保操作统一协调。
副控箱:独立控制各个升降设备,并将各点负载信号实时传输至主控箱主控制器。
传感器:实时采集每个控制点的负载数值,保障系统数据的准确性与安全性。
遥控器:手动信号传输装置,具备启动、上升、下降、停止等操作指令功能。
手机监控终端:集数据监测与功能控制于一体,实时掌握系统运行状态,实现远程智能管理。
主控箱:控制整组爬架点同步升降,确保操作统一协调。
副控箱:独立控制各个升降设备,并将各点负载信号实时传输至主控箱主控制器。
传感器:实时采集每个控制点的负载数值,保障系统数据的准确性与安全性。
遥控器:手动信号传输装置,具备启动、上升、下降、停止等操作指令功能。
手机监控终端:集数据监测与功能控制于一体,实时掌握系统运行状态,实现远程智能管理。
We believe the projects that we have executed speak for themselves. CITIC HIC has engineered and provided 6 AG mills of Ø12.2m×11m (28000kW gearless drive) and 6 overflow discharge ball mills of Ø7.9×13.6m (2×9000kW gear drive) for Sino Iron Project in Australia. For Zijin Mining’s Duobaoshan Copper Mine project in Heilongjiang, we have manufactured and provided SAG mills of Ø11×6.4m (2×9000kW) and overflow discharge ball mills of Ø7.9×13.6m (2×9000kW) which have been well operating currently.
We believe the projects that we have executed speak for themselves. CITIC HIC has engineered and provided 6 AG mills of Ø12.2m×11m (28000kW gearless drive) and 6 overflow discharge ball mills of Ø7.9×13.6m (2×9000kW gear drive) for Sino Iron Project in Australia. For Zijin Mining’s Duobaoshan Copper Mine project in Heilongjiang, we have manufactured and provided SAG mills of Ø11×6.4m (2×9000kW) and overflow discharge ball mills of Ø7.9×13.6m (2×9000kW) which have been well operating currently.