中间梁用于连接多个支撑头(Prop Head),并支撑楼板模板(Slab Panels)。中间梁与支撑头的连接处采用斜口设计,方便快速装拆,极大提升施工效率与灵活性。

中间梁用于连接多个支撑头(Prop Head),并支撑楼板模板(Slab Panels)。中间梁与支撑头的连接处采用斜口设计,方便快速装拆,极大提升施工效率与灵活性。
中间梁用于连接多个支撑头(Prop Head),并支撑楼板模板(Slab Panels)。中间梁与支撑头的连接处采用斜口设计,方便快速装拆,极大提升施工效率与灵活性。
斜口设计,安装拆卸更便捷
高强度支撑,确保楼板系统稳定
适配各类支撑头和模板系统
表面处理优良,耐腐蚀、耐磨损
We believe the projects that we have executed speak for themselves. CITIC HIC has engineered and provided 6 AG mills of Ø12.2m×11m (28000kW gearless drive) and 6 overflow discharge ball mills of Ø7.9×13.6m (2×9000kW gear drive) for Sino Iron Project in Australia. For Zijin Mining’s Duobaoshan Copper Mine project in Heilongjiang, we have manufactured and provided SAG mills of Ø11×6.4m (2×9000kW) and overflow discharge ball mills of Ø7.9×13.6m (2×9000kW) which have been well operating currently.
We believe the projects that we have executed speak for themselves. CITIC HIC has engineered and provided 6 AG mills of Ø12.2m×11m (28000kW gearless drive) and 6 overflow discharge ball mills of Ø7.9×13.6m (2×9000kW gear drive) for Sino Iron Project in Australia. For Zijin Mining’s Duobaoshan Copper Mine project in Heilongjiang, we have manufactured and provided SAG mills of Ø11×6.4m (2×9000kW) and overflow discharge ball mills of Ø7.9×13.6m (2×9000kW) which have been well operating currently.